You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jakpus Rampungkan Normalisasi Saluran Air di Jalan Sayuti

Channel Normalization on Jalan Sayuti Completed

The normalization of water channel ln Jalan Sayuti, RW 05, Rawasari, Cempaka Putih, run by Central Jakarta Water Resources Sub-agency since September 26, 2025, is now completed.

completed on December 31

Head of Central Jakarta Water Resources Sub-agency, Citrin Indriati said This 537 meter long channel was normalized using 60 x 60 centimeter U-ditch concrete.

Coastal Residents in Jakarta Urged to Be Alert for Tidal Flooding

"The normalization work involved 23 blue personnel. The project was completed on December 31," she said, Monday (1/5).

She is optimistic the channel will solve inundation that often happens at RW 05 of Rawasari area.

"We urge residents not to throw rubbish into the drains to prevent blockages," she appealed.

Meanwhile, Sigit (38), resident of RW 05 of Rawasari, admitted the newly improved water channel works well.

"There is no inundation in the area," he admitted.

Linked News
Popular News indeks
  1. Volcanic Ash Reaches Jakarta, Health Agency Calls for Protective Measures

    access_time06-09-2026 remove_red_eye1615 personBudhi Firmansyah Surapati
  2. Jakartans Urged to Stay Calm and Take Precautions Amid Mt. Anak Krakatau Volcanic Ash

    access_time06-09-2026 remove_red_eye806 personBudhi Firmansyah Surapati
  3. Jakarta Provincial Government Anticipates the Impact of Volcanic Ash from Mount Anak Krakatau

    access_time06-09-2026 remove_red_eye666 personFolmer
  4. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye606 personFakhrizal Fakhri
  5. Jakarta BPBD Urges Residents to Prepare for Meteorological Drought

    access_time04-09-2026 remove_red_eye572 personAldi Geri Lumban Tobing